Titanium Valley (2015)

JSC ''TESS''
Construction of engineering networks of power supply 10 kV 1 and 2 PCs in the SEZ ''Titanium valley''
Modular integrated distribution substation 10 kV (4 p)
Block complete transformer substations of 1250 kVA (1p)
Block complete transformer, podstantsii 1600 kVA (2 p)
Transformer dry TMC-1250 (2 p)
Transformer dry TMC-1600 (4 p)
- Transformer TLSS-63/10/0,UHL2, 4 D/UN-11 (8 p)
- AMR system of upper level
- Process control system with the upper level system
- High voltage cable 10kV XLPE with section 300 (65 km)
- High voltage cable 10kV XLPE with section 120 (16 km)